number code
Assembly of products and household appliances according to the manufacturer’s control policy can be implemented at different levels from the point of view of production planning.
Product production as: (Completely Built Unit) C.B.U
Product production by the method: (Semi Knoched Down) S.K.D
Product production method: (Completely Kocked Down) C.K.D
According to the described production systems (material supply), different equipment and production lines are required. With experienced experts and technical facilities, the company is ready to design and build assembly lines and equipment needed by each of the companies’ production methods.
All rights are reserved for the company of efforts for daily industry. TalashBSR